25730 Post, Prefabricated Retentive

20000

RESTORATION

25000

RESTORATIONS, INLAYS, ONLAYS, PINS AND POSTS

25700

POSTS

25730 Post, Prefabricated Retentive
25731

One post

165.85
+Material Expenses
165.85
+Mater. Exp.
25732

Two posts same tooth

275.33
+Material Expenses
275.33
+Mater. Exp.
25733

Three posts same tooth

375.42
+Material Expenses
375.42
+Mater. Exp.
Log in to add to favourites