25730 Post, Prefabricated Retentive
20000 | RESTORATION |
||
25000 | RESTORATIONS, INLAYS, ONLAYS, PINS AND POSTS |
||
25700 | POSTS |
||
25730 | Post, Prefabricated Retentive | ||
25731 | One post |
165.85
+Material Expenses |
165.85
+Mater. Exp. |
25732 | Two posts same tooth |
275.33
+Material Expenses |
275.33
+Mater. Exp. |
25733 | Three posts same tooth |
375.42
+Material Expenses |
375.42
+Mater. Exp. |